A metal building is only as square and level as the slab under it. The anchor bolts must land where the building supplier's anchor bolt plan says, to the fraction of an inch, or the frames won't stand. We prepare the site, excavate the footings, set the forms and bolts, and place the slab to the stamped foundation design for your building.

Graded red-clay site with forms and footing trenches laid out next to an existing metal building
Site prep and footing layout for a metal building slabIndustrial / metal building · Company photo

01 · How it works

What the work involves

Metal building foundations in Texas are designed by an engineer for the building's loads and the site's soil. That matters especially in DFW, where expansive clay can shrink and swell enough to crack slabs that weren't designed for it. We build from that design and don't substitute our own.

The two documents we need are the foundation drawings (slab thickness, beams or footings, reinforcing) and the building manufacturer's anchor bolt plan. Bolt positions are checked against the plan before every pour.

Our own dump trucks and track loaders handle site clearing, footing excavation and spoil haul-off without waiting on a separate subcontractor.

04 · Work methodology

How we do it

  1. 01

    Review documents

    Read the foundation drawings and anchor bolt plan and confirm questions with your engineer or supplier.

  2. 02

    Site prep

    Clear and grade the site, excavate footings or beams, and haul off spoil.

  3. 03

    Form and steel

    Set forms, reinforcing, vapor retarder and anchor bolts, and check them against the plan.

  4. 04

    Place and finish

    Pour, finish and cut joints at the right time.

  5. 05

    Cure and verify

    Cure the slab and verify bolt positions before the erector arrives.

05 · Materials and systems

Concrete mix, reinforcing and vapor retarder follow the foundation drawings. If the drawings don't specify a mix, we'll confirm it with your engineer before ordering.

06 · Field photos

Reinforcing steel set on chairs for a concrete pad replacement beside truck loading docks
Pad replacement at a truck dock, reinforcing set on chairsIndustrial / distribution · Company photo
Texas Waterproofing dump truck with the company logo on the door being loaded with concrete debris by a compact track loader
Company dump truck and track loader hauling demolition debrisCommercial site · Company photo

07 · Buyer questions

Questions property and project managers ask

Do you design the foundation?
No. The foundation for a metal building should come from an engineer. Your building supplier can often provide one. We build what's on the stamped drawings.
Can you handle the site work too?
Yes. Clearing, grading, footing excavation and haul-off are done with our own equipment.

Start a project · 03 30 00

Metal Building Pads: send us the site.

Send photos, the address and a rough size on WhatsApp. We reply with questions or a site visit time. Prefer to talk? Call or text the same number.

At a glance

What Texas Waterproofing does

Company
Texas Waterproofing, a commercial concrete restoration and waterproofing contractor
Based in
Dallas–Fort Worth Metroplex, Texas. Also serves Austin and San Antonio
Customers
Commercial property owners, property managers, HOAs, multifamily and industrial facilities
Experience
11+ years. Own crews, dump trucks, track loaders and concrete saws
Not offered
Roofing, asphalt paving, residential remodeling, engineering design
Contact
WhatsApp, call or text 214-672-3839
WhatsAppCallText